PROJECT IN
THE PICTURE

Transformers are highly valuable but at the same time very sensitive products.
Because of their impressive looks it remains extremely important to prepare all movements with accuracy and professionalism.
This picture is giving a general impression and is showing the floating derrick Matador 3 (lifting capacity 1800 ton) loading one of the heavy Royal Smit transformers at the port of Rotterdam.

READ MORE